Kestrel Labs

[ Pricing ]

A month of Kestrel costs less than a day of a principal's review.

  • Priced per project. Smaller buildings cost less, bigger buildings cost more.
  • Bill it to your projects, or pay one annual rate as software for your firm.
  • Everyone on the team is included. No tokens, no hidden fees. Run it as often as you want.
Architectural collage in flame orange and linen — an orange sun rising over a dark doorway with a white moon, set above ascending marble stairs.

[ ROI calculator ]

Calculate your return on investment with Kestrel.

One issue, a dead-end corridor over the IBC limit, on a 60,000 square foot mixed-use building with $18M of construction. Set your construction cost and the phase the issue is found in.

A month of KestrelKestrel

[01]Design developmentDD

[02]Construction documentsCD

[03]Plan checkPlan check

[04]ConstructionCA

$18M

When is the issue found?

$90,500

to find it at plan check

$1,300

for a month of Kestrel

70×

the monthly cost of Kestrel, on one issue

[ ? ]

Where these numbers come from

The example is illustrative. It prices one issue at each phase from the assumptions below; it does not measure what Kestrel finds.

  • Hours. Our estimate of the architecture and consultant hours to resolve one egress issue at each phase, from a wall move at schematic design to redrawn and re-coordinated sheets at construction documents, a correction response at plan check, and a redesign plus field change during construction.
  • Billing rates. Principal $205, project architect $160, designer $110 and consultant engineer $165 an hour, from a 2025 municipal architecture and engineering rate schedule (City of South Bend, Indiana). Your rates may be higher.
  • One correction cycle. Taken as one month: published city plan-review targets run two to six weeks for a first review and about two weeks for a resubmittal (Santa Cruz, Milpitas, Aurora, Piedmont), and the applicant's response adds the rest. The National Multifamily Housing Council's construction survey finds 97 percent of apartment developers report delays, 83 percent of them citing permitting.
  • What a month of delay costs the owner. Construction cost escalation at 4 percent a year (the Turner Building Cost Index rose 4 to 5 percent through 2025) plus interest at 8 percent on land and soft costs already deployed, taken as 20 percent of construction cost.
  • A field fix. Direct demolition and rebuild at 0.4 percent of construction cost plus a 15 percent change-order markup, two weeks of the contractor's general conditions (8 percent of contract over a 14-month build), and the redesign.
  • Rework across the project. The Construction Industry Institute puts direct rework at about 5 percent of total construction cost on average, with a range of 2 to 20 percent. Public-agency studies attribute roughly a third of change orders to design errors and omissions.

[ What's Included ]

Everything you need is included.

No tokens, no seats, no setup charges.

Included

[01]

Everyone on the project

No seat licenses. Anyone working on the project is in.

Included

[02]

Unlimited checks

Automatic on every model update, or whenever you want. No usage charges.

Included

[03]

Access in Revit, Forma, Bluebeam, and Kestrel

View violations in the model, on the sheets, or in the cloud.

Included

[04]

Onboarding and calibration

Set up to your modeling standards, with support as you expand.

Included

[05]

Your jurisdictions' codes

The editions your projects need, confirmed at kickoff.

[ Your estimate ]

See what Kestrel costs for the way you work.

Kestrel is priced per project. You can bill it to your projects or pay for it as software for your firm. Enter your details to see what each would cost.

You’ll also get The Kestrel Brief, our monthly newsletter. Unsubscribe anytime. Privacy

[ Schedule a Demo ]

See it catch issues while they are still easy to fix.

In a 30-minute demo, we'll show you Kestrel catch a new violation after a model update, run the same check live in Revit, and learn a little about your team's work. If it makes sense to move forward, we'll recommend a starting point and give you clear pricing.

Schedule a Demo

Want to see it before you talk numbers? Run the demo

[ FAQ ]

Frequently asked

[01]

Can we bill Kestrel to the project as a reimbursable?

Yes, where your agreements allow. We send one invoice each month, itemized by project name, so each line goes onto its project. Some firms bill it to the owner as a reimbursable; others treat it as a project cost in their fee.

[02]

Do we pay per user, per check, or per seat?

No. Kestrel is priced per project, by building size. Everyone working on the project is included and checks are unlimited.

[03]

How does building size affect the price?

A 25,000 to 75,000 square foot building counts as one project. Smaller buildings count as a quarter or half of a project, and larger ones as two or more, so a campus is priced like the buildings it contains.

[04]

Is there a limit on how often we can run checks?

No. Run Kestrel as often as you want, on every project you have on it, with no token or usage charges.

[05]

Can we pay for it as software instead?

Yes. Choose how many projects you want running at once and pay one annual rate for your firm. The more projects it covers, the less each one costs.

[06]

We have more than 50 projects running at once.

Above 50 projects we put a firm-wide number together with you. Book thirty minutes and we will work it out.

[07]

What does onboarding cost?

Nothing extra. Onboarding, calibration to your modeling standards and support are included.

[08]

Which codes are included?

The code editions your projects need, confirmed at kickoff. Ask us about your jurisdictions and we will tell you exactly what is covered.

[09]

How do we get started?

Book a 30-minute demo. We will show Kestrel catch a new violation after a model update, run it live in Revit on a model like yours, and recommend a starting point.